Solar panels for manufacturingthat keep production costs down

Solar panels for manufacturing sites generate power right where machines, compressors and lighting use it. Systems are sized to your shifts and process loads.

Demand patternShift-led, heavy in daylight
Key loadsCompressors, motors, process
Grid connectionG99 application handled

All of our installs are accredited by

SolarEdge
MCS Certified
Trading Standards TSI Approved Code
NICEIC Approved Contractor

When a factory uses its power

Production sites jump into life as the first shift starts, hold a heavy plateau through the day and drop away when the last shift ends. Solar covers the middle of that curve.

  • Daytime process loads are big enough to absorb most solar output, even from a large array.
  • Shift changeovers and machine start-ups cause short peaks. A battery can help smooth them.
  • Overnight demand is low, so we size the array to your daytime load, not simply to fill the roof.

Typical weekdayElectricity demand vs solar generation, by hour

00:0006:0012:0018:0024:00Two shifts, 06:00–22:00
Site demandSolar generationSolar used on site

Illustrative profile. Your proposal is modelled on your own half-hourly data.

Factory energy challenges, and how we solve them

Production energy is a cost you can’t switch off. Here’s where it comes from on a typical site and how we bring it down.

Talk to our team
01The challenge

Compressors, motors and process equipment

How we solve it

We design from your half-hourly data, so the system reflects real demand from compressed air, extraction and machinery. Most output is then used on site.

02The challenge

Shift patterns and demand peaks

How we solve it

Solar covers the daytime plateau, and battery storage can release power when shifts overlap or heavy machines start up, helping smooth peaks.

03The challenge

Ageing or fragile industrial roofs

How we solve it

We check structure, condition and remaining roof life first. Where a roof isn’t right, spare land on site can host a ground-mounted array instead.

04The challenge

Customers asking about your carbon

How we solve it

Monitoring tracks generation and carbon saved, giving you clear figures for supplier questionnaires, tenders and sustainability reports.

Swipe to see more

Featured project

Proof, not promises. A recent project of ours.

+£742,824

Projected 25-year saving · Princess Christian, Woking, Surrey

Princess Christian in Woking, Surrey runs on a 64.24 kWp rooftop system. It shows how we model savings, payback and on-site use before you commit.

System64.24 kWp
Payback4–5 years

Figures are projections from the customer’s proposal.

Princess ChristianReal install
Princess ChristianWoking, Surrey

Industrial solar questions answered

Straight answers to the questions we’re asked most. Pick a question to read the answer.

  • For most sites with strong daytime demand, it is. The more of your generation you use on site, the stronger the return, and manufacturers often use most or all of it. Your proposal shows projected savings, payback and a 25-year cash flow based on your own consumption.

  • Most modern metal and flat industrial roofs can. We carry out a structural assessment and check the roof’s condition and remaining life. Older fibre cement roofs need extra care, and sometimes a ground-mount array or roof upgrade is the better route.

  • Cost depends on system size, roof type, battery storage and any grid connection works. Your proposal sets out the price alongside projected savings and payback. You can buy outright or finance the system, with repayments that can be covered by the savings.

  • It depends on your demand profile and usable roof or land area. We size systems to maximise on-site use rather than simply filling the roof. Larger systems need a G99 application to your DNO, which we handle for you.

  • Not if it’s planned well. Rooftop work runs alongside normal operations, and the final electrical connection is scheduled for a planned shutdown, weekend or low-demand period that you agree.

  • The system connects into your existing electrical installation, usually at the main distribution board. Solar power is used first and the grid tops up the rest, so supply to your machinery is seamless.

  • Capital allowances may apply to commercial solar and can improve the return, so speak to your accountant. Grant schemes change, so we won’t build them into your numbers unless they’re confirmed. Surplus power can be exported through the Smart Export Guarantee.

  • Very little day to day. Industrial sites can be dusty, so periodic cleaning and inspection help keep output high. Our operations and maintenance service and remote monitoring flag issues early, wherever you are in the UK.

Answer 01 / 08

Are solar panels for manufacturing worth the investment?

For most sites with strong daytime demand, it is. The more of your generation you use on site, the stronger the return, and manufacturers often use most or all of it. Your proposal shows projected savings, payback and a 25-year cash flow based on your own consumption.

Can our factory roof take solar panels?

Most modern metal and flat industrial roofs can. We carry out a structural assessment and check the roof’s condition and remaining life. Older fibre cement roofs need extra care, and sometimes a ground-mount array or roof upgrade is the better route.

How much do solar panels for manufacturing cost?

Cost depends on system size, roof type, battery storage and any grid connection works. Your proposal sets out the price alongside projected savings and payback. You can buy outright or finance the system, with repayments that can be covered by the savings.

How big a system does an industrial site need?

It depends on your demand profile and usable roof or land area. We size systems to maximise on-site use rather than simply filling the roof. Larger systems need a G99 application to your DNO, which we handle for you.

Will the installation interrupt production?

Not if it’s planned well. Rooftop work runs alongside normal operations, and the final electrical connection is scheduled for a planned shutdown, weekend or low-demand period that you agree.

How does solar connect to our existing supply?

The system connects into your existing electrical installation, usually at the main distribution board. Solar power is used first and the grid tops up the rest, so supply to your machinery is seamless.

Are there tax benefits or grants?

Capital allowances may apply to commercial solar and can improve the return, so speak to your accountant. Grant schemes change, so we won’t build them into your numbers unless they’re confirmed. Surplus power can be exported through the Smart Export Guarantee.

What maintenance does an industrial system need?

Very little day to day. Industrial sites can be dusty, so periodic cleaning and inspection help keep output high. Our operations and maintenance service and remote monitoring flag issues early, wherever you are in the UK.

Still have a question?Talk to our team. No pressure, just straight answers. hello@pinkrenewables.co.uk
0800 043 6000
Still have a question?Talk to our team. No pressure, just straight answers.Call 0800 043 6000

READY WHEN YOU ARE

Let’s build a smarter, more sustainable business.

Tell us what you’re working with and we’ll show you what your site could do.

Get a solar assessment

Pink Renewables

Commercial solar systems for a lower-carbon future.

Find us

Passion House, Excalibur Road, Beacon Park, Gorleston, Norfolk, NR31 7BB, United Kingdom

0800 043 6000 · hello@pinkrenewables.co.uk · Norfolk + UK wide

0800 043 6000 · hello@pinkrenewables.co.uk · Norfolk + UK wide

© 2026 Pink Renewables. Pink Renewables is a trading name of Pink Group Holdings Ltd, registered in England and Wales (company no. 07448391). Registered office: Passion House, Excalibur Road, Gorleston, Norfolk NR31 7BB.

Website built by

Navigate